Factories, Workshops, Small industries, Manufacturing units
1. REQUIRED DOCUMENTS
Prepare the following documents before applying:
A. Applicant & Business Details
- Applicant Name (Owner / Partner / Company)
- Address proof (Aadhaar / Voter ID / Passport)
- Mobile number & Email ID
- Passport size photo
B. Business Registration Documents
- Proprietorship: Self-declaration
- Partnership: Partnership Deed
- Company: Certificate of Incorporation
- GST Registration Certificate (if applicable)
- PAN Card (Individual / Firm / Company)
C. Land & Building Documents
- Ownership Certificate / Title Deed
- Property Tax Receipt (latest)
- Building Permit / Completion Certificate
- Building Number issued by Municipality
- Rent Agreement (if rented)
D. Industry-Specific Approvals
- Consent from Kerala State Pollution Control Board (PCB)
- Fire Safety Certificate (if required)
- Factory License (for large industries)
- Explosive / Hazardous license (if applicable)
E. Site & Operation Details
- Site Plan / Layout Plan
- Machinery Details (list + power load)
- Process Description (what you manufacture)
- Waste disposal plan
F. NOCs (if required)
- Fire Department NOC
- Health Department NOC
- Electricity Connection Proof (KSEB)
2. APPLICATION FORM CONTENT
The Industrial Trade License application should include:
- Name of Industry
- Type of Industry (manufacturing / processing / workshop)
- Location with Ward Number
- Nature of activity
- Number of workers
- Installed machinery & HP details
- Pollution category (Green / Orange / Red)
- Working hours
3. STEP-BY-STEP APPLICATION PROCESS
STEP 1: Identify License Type
- Confirm category:
- Small workshop
- Medium industry
- Hazardous / heavy industry
STEP 2: Obtain Application Form
- Visit Municipal Corporation Office
OR - Download from official website (if available)
STEP 3: Fill Application
- Enter all business details
- Attach required documents
- Sign declaration
STEP 4: Submit Application
- Submit at:
- Corporation Office / Zonal Office
- Get Acknowledgment Receipt
STEP 5: Pay Application Fee
- Fee depends on:
- Industry type
- Area size
- Machinery power
STEP 6: Site Inspection
- Health Inspector / Engineer will visit
- They verify:
- Location suitability
- Pollution control
- Safety measures
STEP 7: Approval Process
- File goes through:
- Health Department
- Engineering Section
- Secretary Approval
STEP 8: License Issuance
- If approved:
- License Certificate issued
- Valid for 1 year (renew annually)
4. IMPORTANT CONDITIONS
- Must comply with Pollution Control norms
- No industrial activity in residential-restricted zones
- Noise and waste limits must be followed
- Safety equipment mandatory
- Renewal required every year
5. FEES (GENERAL STRUCTURE)
Fees vary based on:
- Industry category (low / medium / high risk)
- Building area (sq.ft)
- Machinery horsepower
Typical range:
- Small unit: ₹1,000 – ₹5,000
- Medium: ₹5,000 – ₹25,000
- Large: ₹25,000+
6. RENEWAL PROCESS
- Submit renewal application before expiry
- Attach:
- Previous License copy
- Updated tax receipt
- PCB consent renewal
- Pay renewal fee
7. COMMON REJECTION REASONS
- Missing PCB approval
- Improper zoning (residential area)
- Incomplete documents
- No fire safety compliance
- Illegal building construction
8. PRO TIP (VERY IMPORTANT)
Before applying:
- First secure Pollution Control Board Consent
- Then apply for Industrial License
👉 This avoids rejection and delays
