Projects with multiple landowners / shared ownership
1. REQUIRED DOCUMENTS
A. OWNERSHIP & LEGAL DOCUMENTS
- Joint Ownership Deed / Title Deed
- Registered document proving shared ownership
- Must include all owners’ names
- Possession Certificate
- Issued by Village Office
- Land Tax Receipt (Latest)
- Paid up-to-date
- Encumbrance Certificate (EC)
- Minimum 13 years (or as required)
- Location Sketch & Survey Plan
- Certified by Village Office / Survey Dept.
B. CONSENT & AGREEMENTS
- Joint Ownership Consent Agreement
- Signed by all co-owners
- Includes:
- Consent for construction
- Share allocation
- Authorized applicant (if one person applies)
- Power of Attorney (if applicable)
- If one person/agent applies on behalf of all
- Development Agreement
(if builder/promoter involved)- Agreement between landowners & developer
C. BUILDING PLAN DOCUMENTS
- Site Plan
- Showing boundaries, road access, setbacks
- Building Plan
- Floor plans, elevations, sections
- Service Plan
- Water, drainage, septic tank, rainwater harvesting
- Structural Stability Certificate
- From licensed structural engineer
- Design Certificate
- From registered Architect / Engineer / Supervisor
D. TECHNICAL & STATUTORY DOCUMENTS
- Land Use Certificate
- Confirms zoning compliance
- Fire & Safety NOC
(for large buildings / apartments) - Environmental Clearance
(if applicable for large projects) - Access Road Proof
- Minimum required road width certificate
- Parking Plan
- Mandatory for multi-unit buildings
E. APPLICANT & PROFESSIONAL DETAILS
- ID Proof of All Owners
- Aadhaar / PAN
- Address Proof
- Photographs of Owners
- License Copy of Architect/Engineer
2. STEP-BY-STEP APPLICATION PROCESS
STEP 1: LAND & OWNERSHIP VERIFICATION
- Confirm:
- Land classification (Dry land / Residential zone)
- No legal disputes
- Proper access road
STEP 2: PREPARE JOINT AGREEMENT
- Draft and sign:
- Joint ownership consent
- Share distribution
- Notarize / Register if required
STEP 3: APPOINT LICENSED PROFESSIONAL
- Hire:
- Architect / Engineer / Supervisor
- They will:
- Prepare drawings
- Ensure KMBR compliance (Kerala Municipality Building Rules)
STEP 4: PREPARE BUILDING DRAWINGS
Include:
- Site plan
- Floor plan
- Elevation
- Section
- Parking layout
STEP 5: CREATE ONLINE APPLICATION
Apply via:
👉 Kerala Government Building Permit Portal (SANKETHAM / KSMART)
- Register account
- Select:
“Joint Application / Multiple Ownership”
STEP 6: FILL APPLICATION DETAILS
Enter:
- Property details
- Owner details (ALL owners mandatory)
- Building details:
- Area
- Floors
- Usage (residential/commercial)
STEP 7: UPLOAD DOCUMENTS
Upload:
- Ownership documents
- Joint agreement
- Plans & certificates
- ID proofs
(PDF format, size as per portal limits)
STEP 8: FEE PAYMENT
Pay:
- Application fee
- Permit fee (based on plinth area)
- Scrutiny fee
Online payment via:
- Net banking / UPI / Debit card
STEP 9: SITE INSPECTION
Municipal officials will:
- Visit site
- Verify:
- Boundary
- Road access
- Land condition
STEP 10: TECHNICAL SCRUTINY
Authority checks:
- KMBR compliance
- FAR (Floor Area Ratio)
- Setbacks
- Height restrictions
STEP 11: APPROVAL / CORRECTIONS
- If compliant → Permit Approved
- If issues → Correction Notice issued
STEP 12: PERMIT ISSUANCE
You receive:
- Digitally signed Building Permit
- Approved plan copy
IMPORTANT RULES (KERALA SPECIFIC)
- All owners must sign or authorize
- Minimum road width required (varies by building type)
- FAR & coverage limits apply
- Separate unit ownership requires proper division plan
- Apartment projects may need additional approvals
COMMON REJECTION REASONS
- Missing consent from one owner
- Incorrect land classification
- Incomplete documents
- Non-compliant building plan
- Insufficient road width
BONUS: SAMPLE DECLARATION FORMAT
Joint Owner Declaration
We, the undersigned joint owners of the property located at [Address], hereby jointly agree and give consent for construction of a building as per the submitted plan. We authorize [Applicant Name] to submit and process the building permit application on our behalf.
We agree to abide by all rules and regulations of the Municipality.
Owner 1 Name & Signature
Owner 2 Name & Signature
Owner 3 Name & Signature
Date:
Place:
FINAL CHECKLIST
✔ Joint ownership deed
✔ Consent agreement signed
✔ Approved building plan
✔ Structural certificate
✔ Online application submitted
✔ Fees paid
