Industrial Trade License

Factories, Workshops, Small industries, Manufacturing units


1. REQUIRED DOCUMENTS

Prepare the following documents before applying:

A. Applicant & Business Details

  • Applicant Name (Owner / Partner / Company)
  • Address proof (Aadhaar / Voter ID / Passport)
  • Mobile number & Email ID
  • Passport size photo

B. Business Registration Documents

  • Proprietorship: Self-declaration
  • Partnership: Partnership Deed
  • Company: Certificate of Incorporation
  • GST Registration Certificate (if applicable)
  • PAN Card (Individual / Firm / Company)

C. Land & Building Documents

  • Ownership Certificate / Title Deed
  • Property Tax Receipt (latest)
  • Building Permit / Completion Certificate
  • Building Number issued by Municipality
  • Rent Agreement (if rented)

D. Industry-Specific Approvals

  • Consent from Kerala State Pollution Control Board (PCB)
  • Fire Safety Certificate (if required)
  • Factory License (for large industries)
  • Explosive / Hazardous license (if applicable)

E. Site & Operation Details

  • Site Plan / Layout Plan
  • Machinery Details (list + power load)
  • Process Description (what you manufacture)
  • Waste disposal plan

F. NOCs (if required)

  • Fire Department NOC
  • Health Department NOC
  • Electricity Connection Proof (KSEB)

2. APPLICATION FORM CONTENT

The Industrial Trade License application should include:

  • Name of Industry
  • Type of Industry (manufacturing / processing / workshop)
  • Location with Ward Number
  • Nature of activity
  • Number of workers
  • Installed machinery & HP details
  • Pollution category (Green / Orange / Red)
  • Working hours

3. STEP-BY-STEP APPLICATION PROCESS

STEP 1: Identify License Type

  • Confirm category:
    • Small workshop
    • Medium industry
    • Hazardous / heavy industry

STEP 2: Obtain Application Form

  • Visit Municipal Corporation Office
    OR
  • Download from official website (if available)

STEP 3: Fill Application

  • Enter all business details
  • Attach required documents
  • Sign declaration

STEP 4: Submit Application

  • Submit at:
    • Corporation Office / Zonal Office
  • Get Acknowledgment Receipt

STEP 5: Pay Application Fee

  • Fee depends on:
    • Industry type
    • Area size
    • Machinery power

STEP 6: Site Inspection

  • Health Inspector / Engineer will visit
  • They verify:
    • Location suitability
    • Pollution control
    • Safety measures

STEP 7: Approval Process

  • File goes through:
    • Health Department
    • Engineering Section
    • Secretary Approval

STEP 8: License Issuance

  • If approved:
    • License Certificate issued
    • Valid for 1 year (renew annually)

4. IMPORTANT CONDITIONS

  • Must comply with Pollution Control norms
  • No industrial activity in residential-restricted zones
  • Noise and waste limits must be followed
  • Safety equipment mandatory
  • Renewal required every year

5. FEES (GENERAL STRUCTURE)

Fees vary based on:

  • Industry category (low / medium / high risk)
  • Building area (sq.ft)
  • Machinery horsepower

Typical range:

  • Small unit: ₹1,000 – ₹5,000
  • Medium: ₹5,000 – ₹25,000
  • Large: ₹25,000+

6. RENEWAL PROCESS

  • Submit renewal application before expiry
  • Attach:
    • Previous License copy
    • Updated tax receipt
    • PCB consent renewal
  • Pay renewal fee

7. COMMON REJECTION REASONS

  • Missing PCB approval
  • Improper zoning (residential area)
  • Incomplete documents
  • No fire safety compliance
  • Illegal building construction

8. PRO TIP (VERY IMPORTANT)

Before applying:

  • First secure Pollution Control Board Consent
  • Then apply for Industrial License
    👉 This avoids rejection and delays