1. REQUIRED DOCUMENTS
Prepare the following documents before applying:
A. Ownership & Identity Documents
- Title Deed (Sale Deed / Gift Deed / Partition Deed)
- Latest Land Tax Receipt
- Possession Certificate
- Encumbrance Certificate (EC – last 10–15 years)
- Aadhaar Card / ID Proof of Owner
- Address Proof of Owner
B. Land & Site Documents
- Location Sketch (Village Office approved)
- Site Plan (showing boundaries, road access, etc.)
- Survey Sketch (if applicable)
- Land Use Certificate (if required)
- Zoning Clearance (if applicable)
C. Building Plan Documents
- Building Plan (approved & signed by Licensed Engineer/Architect)
- Elevation Drawing
- Section Drawing
- Structural Stability Certificate
- Floor-wise Area Calculation Statement
D. Technical Certificates
- Structural Design Certificate (by Structural Engineer)
- Soil Test Report (for large buildings)
- Rainwater Harvesting Plan (if required)
- Septic Tank / Waste Disposal Plan
E. NOCs (If Applicable)
- Fire & Rescue NOC (for commercial/high-rise buildings)
- Pollution Control Board Clearance
- Airport Authority NOC (if near airport zone)
- Coastal Regulation Zone (CRZ) Clearance (if applicable)
- Electricity Board Clearance
F. Additional Documents
- Application Form (filled and signed)
- Self Declaration by Owner
- Affidavit (if required)
- Copy of Approved Layout (for plots in layouts)
- Previous Building Permit (if reconstruction)
2. STEP-BY-STEP APPLICATION PROCESS
STEP 1: Hire Licensed Professional
- Engage a licensed Architect/Engineer
- They prepare:
- Building plan
- Drawings
- Structural details
STEP 2: Document Collection
- Collect all ownership, land, and technical documents listed above
- Ensure:
- Name consistency
- No legal disputes
STEP 3: Prepare Building Plan
- Architect prepares plan as per:
- Kerala Municipality Building Rules (KMBR)
- Setback rules
- FAR (Floor Area Ratio)
- Height restrictions
STEP 4: Online / Offline Application Submission
Option A: Online (Recommended)
- Visit Municipal Portal (e.g., SANKETHAM / Corporation portal)
- Create login
- Fill application:
- Owner details
- Property details
- Building details
- Upload all documents
- Submit application
Option B: Offline
- Visit Corporation/Municipality office
- Submit application form with documents
STEP 5: Application Scrutiny
- Officials verify:
- Land ownership
- Zoning compliance
- Building rules compliance
- If errors:
- Application returned for correction
STEP 6: Site Inspection
- Municipal Engineer visits site
- Verifies:
- Land boundaries
- Road access
- Actual conditions vs plan
STEP 7: Fee Payment
- Pay required fees:
- Application fee
- Permit fee (based on area)
- Development charges
- Scrutiny fee
STEP 8: Approval Process
- Final approval by:
- Assistant Engineer
- Town Planning Officer
- Secretary (Municipality/Corporation)
STEP 9: Permit Issuance
- Building Permit issued with:
- Permit Number
- Approved Plan
- Validity period (usually 3 years)
STEP 10: Start Construction
- Begin construction as per approved plan
- Display permit at site
STEP 11: Stage Inspections (During Construction)
- Foundation stage
- Plinth level
- Roof level
STEP 12: Completion & Occupancy Certificate
After construction:
- Apply for:
- Completion Certificate
- Occupancy Certificate
3. PROCESS TIME
- Normal Approval Time: 15–30 days
- Large/Complex Buildings: 30–60 days
4. IMPORTANT RULES
- No construction without permit (illegal)
- Follow approved plan strictly
- Deviations lead to:
- Penalty
- Demolition notice
5. COMMON FEES
- Application Fee
- Permit Fee (per sq.m)
- Development Charges
- Regularization Fee (if deviations)
6. ✅ FINAL CHECKLIST
✔ All documents verified
✔ Plan signed by licensed engineer
✔ Fees paid
✔ Site inspection completed
✔ Permit copy received