REQUIRED DOCUMENTS
A. Identity & Ownership
- Aadhaar Card (Owner)
- Property Tax Receipt (latest)
- Ownership Proof:
- Sale Deed / Title Deed
- Possession Certificate
- Building Number Certificate (from Municipality)
B. Building & Technical Documents
- Approved Building Plan
- Completion Certificate (if building completed)
- Location Sketch / Site Plan
- Plumbing Layout Plan (sewer line connection)
C. NOCs (if required)
- Road Cutting Permission (if pipeline crosses road)
- Consent from neighboring property (rare cases)
- Environmental clearance (for commercial/large buildings)
D. Utility & Supporting Documents
- Previous Water Connection Details (if any)
- Septic Tank Details (if converting to sewer line)
- Applicant Photograph
- Mobile Number & Email ID
2. APPLICATION FORM FORMAT
SEWERAGE CONNECTION APPLICATION FORM
To:
The Secretary
Thiruvananthapuram Municipal Corporation
Applicant Details:
- Name:
- Address:
- Mobile Number:
- Email ID:
Property Details:
- Ward Number:
- Door/Building Number:
- Survey Number:
- Property Tax Number:
Connection Details:
- Type of Building: Residential / Commercial
- Number of Floors:
- Water Source: KWA / Well / Borewell
- Existing Septic Tank: Yes / No
Technical Details:
- Distance to Main Sewer Line:
- Proposed Pipe Size:
- Plumbing Contractor Name & License No:
Declaration:
I hereby declare that the above information is true and agree to follow all municipal sewerage rules.
Place:
Date:
Signature of Applicant
3. STEP-BY-STEP APPLICATION PROCESS
METHOD 1: ONLINE (Kerala – Sanchaya / e-Governance Portal)
Step 1: Visit Portal
- Go to Municipal service portal (e.g., Sanchaya / Local Self Government portal)
Step 2: Login / Register
- Create account using:
- Mobile number
- OTP verification
Step 3: Select Service
- Choose:
“Sewerage Connection / Drainage Connection”
Step 4: Fill Application
Enter:
- Applicant details
- Property details
- Technical details
Step 5: Upload Documents
Upload scanned copies:
- Aadhaar
- Tax receipt
- Building plan
- Plumbing layout
Step 6: Pay Fees
- Application fee
- Connection charges
- Road cutting charges (if applicable)
Step 7: Submit Application
- Note Application Number for tracking
Step 8: Inspection
- Municipal engineer/site inspector visits property
Step 9: Approval
- After verification, approval is granted
Step 10: Connection Work
- Authorized team connects property to sewer line
METHOD 2: OFFLINE (Municipal Office)
Step 1: Visit Office
Go to:
- Engineering Section / Public Health Section
Step 2: Collect Form
- Ask for:
Sewerage Connection Application Form
Step 3: Fill Form
- Complete all required details
Step 4: Attach Documents
- Submit all required documents (self-attested)
Step 5: Pay Fees
- Pay at municipal counter
- Collect receipt
Step 6: Submit Application
- Get acknowledgment receipt
Step 7: Site Inspection
- Engineer inspects location
Step 8: Approval & Work Order
- Permission issued
- Connection scheduled
Step 9: Installation
- Sewer line connected to main drainage system
4. FEES (APPROXIMATE)
| Type | Amount |
|---|---|
| Application Fee | ₹100 – ₹500 |
| Connection Fee | ₹1,000 – ₹10,000 |
| Road Cutting | Based on area |
| Security Deposit | ₹1,000 – ₹5,000 |
5. PROCESS TIME
- Application Review: 3–7 days
- Inspection: 3–5 days
- Approval: 7–15 days total
6. IMPORTANT RULES
- Do NOT connect illegally to sewer line
- Septic tank must be properly closed (if converting)
- Follow municipal pipe size standards
- Only licensed plumbers allowed
- Penalty for violations may apply
7. COMMON REASONS FOR REJECTION
- Incomplete documents
- Unauthorized building
- No nearby sewer line
- Incorrect technical details