Pollution Control NOC (linked with PCB)

Pollution Control NOC (PCB Consent)

Issued by: Kerala State Pollution Control Board

Types:

  • Consent to Establish (CTE) – Before starting construction/installation
  • Consent to Operate (CTO) – Before starting operations

REQUIRED DOCUMENTS

1. Basic Applicant Documents

  • Application form (online submission print)
  • Aadhaar Card / ID Proof of applicant
  • PAN Card (individual/company)
  • Passport-size photograph
  • Mobile number & email ID

2. Business / Establishment Documents

  • Proof of ownership / lease agreement
  • Trade License (from Municipality / Panchayat)
  • GST Registration Certificate (if applicable)
  • Certificate of Incorporation (for company)
  • Partnership Deed / MOA & AOA (if applicable)

3. Site & Location Documents

  • Location sketch / site plan
  • Land tax receipt
  • Possession certificate
  • Approved building plan
  • Survey number details
  • Distance certificate (from residential areas, water bodies)

4. Project / Industry Details

  • Detailed Project Report (DPR)
  • Manufacturing process flow chart
  • Raw materials list
  • Product details
  • Production capacity

5. Pollution Control Details

  • Effluent Treatment Plant (ETP) details
  • Sewage Treatment Plant (STP) details (if applicable)
  • Air pollution control system details
  • Solid waste management plan
  • Hazardous waste handling details

6. Environmental Documents

  • Environmental Clearance (if required)
  • Risk assessment report (for hazardous industries)
  • Consent fee payment receipt
  • Previous Consent copy (for renewal/CTO)

7. Additional (Case-Based)

  • Fire & Safety Certificate
  • Factory License
  • Groundwater clearance (if applicable)
  • NOC from local authority

STEP-BY-STEP APPLICATION PROCESS

STEP 1: Industry Classification

  • Identify category:
    • Red (high pollution)
    • Orange
    • Green
    • White (minimal pollution)

This determines approval level and documents.


STEP 2: Online Registration

  • Visit PCB portal (Kerala PCB Online Services)
  • Create login ID & password
  • Verify via mobile/email

STEP 3: Select Application Type

  • Choose:
    • Consent to Establish (CTE)
    • Consent to Operate (CTO)
    • Renewal

STEP 4: Fill Application Form

Enter:

  • Applicant details
  • Industry details
  • Location details
  • Pollution control measures
  • Water & air consumption data

STEP 5: Upload Documents

Upload scanned copies:

  • PDF format (as per size limits)
  • Ensure clarity and correct naming

STEP 6: Fee Payment

  • Calculate fee based on:
    • Industry category
    • Capital investment
  • Pay online (Net banking / UPI / Card)

STEP 7: Scrutiny by PCB Officer

  • Application reviewed by PCB officials
  • Queries may be raised → respond online

STEP 8: Site Inspection

  • Field officer visits location
  • Verifies:
    • Pollution control systems
    • Site conditions
    • Compliance

STEP 9: Approval / Rejection

  • If compliant → NOC issued
  • If not → rejection with reasons

STEP 10: Download Certificate

  • Login to portal
  • Download:
    • Consent Certificate (CTE / CTO)

PROCESSING TIME

  • Green category: 7–15 days
  • Orange category: 15–30 days
  • Red category: 30–60 days

 IMPORTANT NOTES

  • Operating without CTO is illegal
  • Renewal must be done before expiry
  • Strict compliance required for hazardous industries
  • Periodic inspections may occur

SUMMARY FLOW

  1. Register →
  2. Select CTE/CTO →
  3. Fill form →
  4. Upload documents →
  5. Pay fee →
  6. PCB scrutiny →
  7. Inspection →
  8. Approval