NOC for Electricity / Water Connection

A. Required Documents

1. Applicant Documents

  • Application Form (KSEB new connection form)
  • ID Proof (Aadhaar / Voter ID / Passport)
  • Address Proof (Ration Card / Rental Agreement / Utility Bill)

2. Property Documents

  • Ownership Proof (Sale Deed / Title Deed)
  • Possession Certificate (from Village Office)
  • Land Tax Receipt (latest)
  • Building Permit (from Municipality/Panchayat)
  • Completion Certificate (if building is finished)

3. Technical Documents

  • Wiring Completion Certificate (issued by Licensed Electrician)
  • Electrical Load Details (connected load in kW)
  • Test Report (Form from Electrical Inspectorate if required)

4. Additional Documents (if applicable)

  • NOC from Local Body (Municipality / Corporation / Panchayat)
  • Consent Letter from Owner (if tenant)
  • NOC from Fire Department (for commercial buildings)
  • Transformer feasibility approval (for high load)

B. Step-by-Step Application Process

Step 1: Prepare Documents

  • Collect all ownership, ID, and building-related documents
  • Ensure electrical wiring is completed and certified

Step 2: Submit Application

  • Apply through:
    • KSEB Office (Section Office), OR
    • Online via KSEB portal
  • Fill in load requirement and connection type

Step 3: Site Inspection

  • KSEB Engineer visits site
  • Verifies wiring, load, and safety compliance

Step 4: Estimate & Fee Payment

  • Receive cost estimate (connection + meter + line charges)
  • Pay fees online or at office

Step 5: Approval & NOC Issuance

  • After verification, NOC is internally approved
  • Service connection order is issued

Step 6: Meter Installation

  • Meter and service line installed
  • Electricity connection activated

C. Timeline

  • Normal: 7–15 days
  • Commercial / High Load: 15–30 days

2. NOC FOR WATER CONNECTION

A. Required Documents

1. Applicant Documents

  • Application Form (KWA / Local Body)
  • ID Proof (Aadhaar / Voter ID)
  • Address Proof

2. Property Documents

  • Title Deed / Ownership Certificate
  • Possession Certificate
  • Latest Land Tax Receipt
  • Building Permit
  • Building Completion Certificate

3. Technical Documents

  • Plumbing Layout Plan
  • Connection Sketch (pipeline route)
  • Water Demand Details (domestic/commercial)

4. Additional Documents

  • Road Cutting Permission (if pipeline crosses road)
  • NOC from Municipality / Panchayat
  • Consent Letter (if tenant)
  • Apartment Association Approval (for flats)

B. Step-by-Step Application Process

Step 1: Document Preparation

  • Collect property and identity documents
  • Prepare plumbing layout

Step 2: Application Submission

  • Apply at:
    • Kerala Water Authority Office, OR
    • Local Self Government Office (Municipality/Panchayat)

Step 3: Site Inspection

  • Engineer verifies:
    • Distance from main pipeline
    • Feasibility of connection
    • Water demand

Step 4: Estimate & Approval

  • Cost estimate issued (connection + pipeline + meter)
  • Submit required fees

Step 5: NOC & Permission

  • NOC issued after verification
  • Road cutting permission granted if required

Step 6: Connection Work

  • Pipeline connection executed
  • Water meter installed

Step 7: Activation

  • Water supply starts

C. Timeline

  • Domestic: 10–20 days
  • Commercial / Complex: 20–45 days

3. COMMON CONDITIONS FOR BOTH NOCs

  • No legal disputes on property
  • Building must follow approved plan
  • All taxes must be cleared
  • Safety compliance is mandatory
  • Unauthorized constructions may lead to rejection

4. QUICK CHECKLIST (BOTH)

✔ ID Proof
✔ Address Proof
✔ Title Deed
✔ Possession Certificate
✔ Tax Receipt
✔ Building Permit
✔ Completion Certificate
✔ Technical Certificates
✔ NOC (if required)